Ashfield CB Vynamic Tenant Fitout

53 State Street, 23rd and 24th Floor, Boston

Ashfield CB Vynamic – Tenant Fitout

About This Project

Tenant build-out of two floors with an interconnected staircase for Cambridge Biomarketing’s new space. All work was completed within an occupied building so communication and coordination between all parties was critical to success. The project included numerous collaborative and private work spaces with the new convenience of the easy-access stair to consolidate the space.

Project Specifications

  • 42,000 SF
  • 4-month schedule
  • Features offices, workstations, collaborative spaces, and a stocked kitchenette
  • Technical nature of Ashfield’s operations required heavy audiovisual utilization throughout construction
  • Accelerated schedule required intensive coordination of mechanical systems in an occupied building