Town of Littleton Reuben Hoar Library

35 Shattuck Street, Littleton

Town of Littleton – Reuben Hoar Library

About This Project

The new Reuben Hoar Public Library project consists of constructing a new two-story, 22,280 SF steel-framed building, with a slab-on-grade lower floor, a composite framed upper deck, steel-framed sloping roofs, concrete frost walls and footings, light-gauge steel-framed walls, connections to and extensions of utilities in both the street and on-site, newly paved parking lot and connections to an existing lot, and associated site work. The building is clad with masonry at the lower level, and cementitious siding and trim at the upper level, and include aluminum-clad wood windows, curtainwall window, and door openings, and asphalt shingle roofing.

Project Specifications

  • 22,280 SF
  • 15-month schedule
  • Site work includes tree and brush clearing, excavation, retaining walls, grading, drainage, access road improvements, work in the wetlands buffer, and underground utility systems, new bituminous concrete parking area, curbing, lawns, site improvements, and other work throughout the site
  • System installations include: VRF mechanical system, electrical, plumbing, technology, and fire protection
  • The project also includes Unit Masonry, Miscellaneous Metals, Waterproofing, Damp proofing & Caulking, Roofing & Flashing, Glass And Glazing, Tiling, Acoustical Ceilings, Resilient Flooring, Painting, Hydraulic Elevators, Fire Protection, Plumbing, HVAC, and Electrical/Technology
  • Pursuant to M.G.L. Chapter 149A CM-at-Risk