SmartLabs Boston Landing

SmartLabs – Boston Landing

About This Project

Interior fit-out of an existing core and shell building (base build). Work scope includes minimal demolition of existing interior partitions and MEP/FP. New construction consists of interior fit-outs for Level 3 and Level 4, which include office space, conference rooms, lounge/café areas, laboratories and maker spaces. Modifications will be made to the existing MEP/FP systems as well as the electrical and Tel/Data to accommodate the new partition layout and life safety codes. New systems furniture will be located in the open office space

Project Specifications

  • 83,707 SF
  • 7-month schedule
  • Infrastructure modifications allowed for finishing of penthouse and rooftop spaces
  • Diligently adhered to life science protocols and consistent communication with the owner, mitigating technical issues before they arose

Other projects in Life Sciences