Biogen Bio6A 5&6 Lab Renovation
![Biogen – Bio6A 5&6 Lab Renovation](https://commodorebuilders.com/wp-content/uploads/2021/02/Biogen-193R-e1643213319402.png)
About This Project
Interior renovation and conversion of existing office space to new open office and biologic lab space. The microscope and tissue culture spaces include fume hoods and bio-safety cabinets, while the open labs had mobile lab benches tied to overhead service panels for power, data, and gas connectivity. Multiple cold rooms were furnished and installed along with utilities to serve numerous equipment amongst multiple user groups.
PROJECT SPECIFICATIONS
- 40,000 SF
- Interior Renovation
- Occupied building
- Complete replacement of the existing MEP/FP systems
- A new expandable 150kVA UPS system was installed and tied into existing distribution without disruption or delay
![](https://commodorebuilders.com/wp-content/uploads/2021/03/Biogen-126R-1-scaled-e1643213603711.jpg)
Photos
Other projects in Life Sciences
![Gritstone Bio](https://commodorebuilders.com/wp-content/uploads/2023/10/Gritstone-Photos-1-scaled.jpg)
![One Charles Park](https://commodorebuilders.com/wp-content/uploads/2023/07/1-Charles-Park-Interior-4-scaled.jpg)
![Rentschler Biopharma Inc.](https://commodorebuilders.com/wp-content/uploads/2023/05/AYIU5121-scaled.jpg)
![103 CityPoint](https://commodorebuilders.com/wp-content/uploads/2023/04/103-CityPoint-5-of-13-scaled.jpg)
![SmartLabs – Seaport](https://commodorebuilders.com/wp-content/uploads/2021/07/SmartLabs-Entrada-Final-HiRes-4-scaled.jpg)
![CRISPR THERAPEUTICS – cGMP Manufacturing Facility](https://commodorebuilders.com/wp-content/uploads/2021/06/LWPH0869-scaled.jpg)
![Takeda – 125 Spring Street Upgrades](https://commodorebuilders.com/wp-content/uploads/2021/06/Takeda-Lexington-Final-HiRes-14-scaled.jpg)
![Bristol Myers Squibb – cGMP Cell Bank Manufacturing](https://commodorebuilders.com/wp-content/uploads/2021/06/IMG_1975.jpg)
![Takeda – cGMP Cell Therapy Manufacturing](https://commodorebuilders.com/wp-content/uploads/2021/06/DSC_8891.jpg)
![Bristol Myers Squibb – cGMP Biologics Manufacturing Facility](https://commodorebuilders.com/wp-content/uploads/2020/10/IMG_6259-scaled-e1643214305319.jpg)
![Biogen – Bio6 5th Floor Lab Renovation](https://commodorebuilders.com/wp-content/uploads/2020/10/IMG_20181221_125257-1-scaled-e1643224879161.jpg)
![Bristol Myers Squibb – Lab, Office & Cafeteria (LOC) Expansion](https://commodorebuilders.com/wp-content/uploads/2020/10/DSC_1881.jpg)
![SmartLabs – Boston Landing](https://commodorebuilders.com/wp-content/uploads/2020/10/40-Guest_BOSTON-LANDING.jpg)
![Biogen – Bio6 Chemistry Lab](https://commodorebuilders.com/wp-content/uploads/2020/10/MG_2909-copy-e1643296041559.jpg)