Biogen Bio6 Chemistry Lab
About This Project
Design-assist lab fit-out project. The new space includes 30+ fume hoods, bio-safety cabinets, solvent dispensing system with Class I Div. II storage, LN2 freezer room, high pressure CO2 distribution system, and open office space. The project also included a new glass connector bridge between Buildings 6 and 6A, which was constructed over an active cafeteria. All new MEP and fire protection systems were installed as a part of this project.
Project Specifications
- 22,000 SF
- Interior Fit-out
- Design Assist