Match Community Day Charter School New Elementary School
50, 100 and 110 Poydras Street, Hyde Park
About This Project
New modular construction of an elementary school in Hyde Park utilizing the DCAMM Chapter 149 A Section 44E process. The project consisted of three buildings; modular construction of two, 2-story classroom buildings and a 3rd, single story pre-engineered metal building for the gymnasium and locker rooms. Close proximity to the Neponset River required constant oversight of the SWPPP and Order of Conditions throughout all construction phases.
Project Specifications
- 71,867 SF
- 11-month schedule
- Off-site modular construction included structural, framing, drywall, insulation, doors, windows, misc. finishes, plumbing, portions of HVAC, and electrical
- Exterior work included clearing an existing site, installing new utilities, road work, parking lot development, and landscaping
- Interior consisted of elevator, fire protection, plumbing, HVAC, and electrical connections along with widespread finishes