UMass Lowell Dandeneau Hall
1 University Avenue, Lowell

About This Project
The project involved the renovation the second floor for the Department of Mechanical Engineering, and floors 3-4 for the Department of Computer Science. The scope entailed major interior renovations to the second and third floors, as well as a conversion of the 4th floor space into various laboratories. Successful execution required careful coordination and preconstruction planning due to the technical nature of the University’s research and how a majority of the facility remained operational during the process.
Project Specifications
- 22,000 SF
- 17-month schedule
- Floor 2 includes 37 offices, a 36-seat classroom, 2 small conference rooms, a kitchen, and 4 collaboration areas
- Floor 3 includes 34 offices, a 36-seat classroom, 4 meeting rooms, and 3 gathering areas, as well as a kitchen
- 4th floor includes 5 research labs, 2 computer teaching labs, a drop-in computer lab, a systems research lab, robotic systems, and an office suite for IT

Photos
Other projects in Institutional




























