Sector: Institutional & Academic

Match Community Day Charter School

Vanderwarker-_0237d-for-web
Vanderwarker-DSC_9615-for-web
Vanderwarker-DSC_9793-for-web
Vanderwarkerdsc_9981-for-web
Vanderwarker_0150-for-web
Vanderwarker-DSC_9903-for-web
Vanderwarkerdsc_0280-for-web
Vanderwarkerdsc_0810-for-web
Vanderwarkerdsc_0876a-for-web
Vanderwarker-_0237d-for-web thumbnail
Vanderwarker-DSC_9615-for-web thumbnail
Vanderwarker-DSC_9793-for-web thumbnail
Vanderwarkerdsc_9981-for-web thumbnail
Vanderwarker_0150-for-web thumbnail
Vanderwarker-DSC_9903-for-web thumbnail
Vanderwarkerdsc_0280-for-web thumbnail
Vanderwarkerdsc_0810-for-web thumbnail
Vanderwarkerdsc_0876a-for-web thumbnail
MATCH image thumbnail

Commodore was selected as the CM for the new modular construction of an elementary school campus for the Match Community Day Charter School in Hyde Park neighborhood of Boston utilizing the DCAMM Chapter 149 A Section 44E process.

The campus consists of three buildings; modular construction of two, 2-story classroom buildings at 20,000 SF and 40,000 SF each and a third, single-story, 13,000 SF pre-engineered metal building housing the gymnasium and locker rooms. Off-site modular construction included structural, framing, drywall, insulation, doors, windows, misc. finishes, plumbing, portions of HVAC, and electrical.

On-site work consisted of clearing an existing site that abuts the MBTA rail line and the Neponset River, as well as new utilities to the site, road work, parking and landscaping. Proximity to the Neponset River required constant oversight of the SWPPP and Order of Conditions throughout all construction phases.

Once the modular portions of the project were manufactured, they were delivered to the site and assembled. On-site work within the buildings consisted of Elevator, Fire Protection, Plumbing, HVAC and Electrical connections. Exterior envelope, flooring, ACT, painting and other finishes were installed on site after the final delivery.